PublicadoEl 23/11/22 por Comillas
Capítulo de libro

Under-relaxed Iterative Procedure for Feasible Short-Term Scheduling of a Hydro Chain.

tipo de documento semantico ckh_publication

Ficheros

IIT-03-017A.pdf
Tamaño 465829
Formato Adobe PDF
Fecha de publicación 23/06/2003
Fuente Libro: IEEE PowerTech 2003, Página inicial: , Página final:
Estado info:eu-repo/semantics/publishedVersion

Resumen

Idioma es-ES
Idioma en-GB
Resumen

This paper presents a method for short-term hydro scheduling. The objective is to determine a feasible operation of a set of coupled hydro units, fulfilling the aggregate requirements obtained from a higher-level hydrothermal coordination tool. In order to take into account the nonlinear relationship among the electrical power, the net head and the turbine water discharge, an under-relaxed iterative procedure is proposed. The performance of this algorithm enhances previous research works as possible diverging oscillations are damped in order to reach the convergence. Therefore, the net heads used to build the power/discharge curves of the head dependent units are determined using previous iterations results. This way, each stage can be solved by means of a MILP optimization problem where binary variables allow modeling the discrete hydro unitcommitment decisions. The process finishes when the maximum gap between the reservoir levels of two consecutive iterations satisfies the convergence tolerance. A case study is also presented to show its application to a real size hydro chain.

Editorial Sin editorial (Bolonia, Italia)
Grupos de investigación y líneas temáticas Instituto de Investigación Tecnológica (IIT)

Palabras clave

Tipo de archivo application/pdf
Idioma en-GB
Tipo de acceso info:eu-repo/semantics/restrictedAccess
Fecha de modificacion 23/05/2022
Fecha de disponibilidad 15/01/2016
fecha de alta 15/01/2016

Kategoriak:

Honekin partekatua: