PublicadoEl 23/11/22 por Comillas
Artículo

How can the renewables targets be reached cost-effectively? Policy options for the development of renewables and the transmission grid

tipo de documento semantico ckh_publication

Ficheros

IIT-18-014A.pdf
Tamaño 1323713
Formato Adobe PDF
Fecha de publicación 01/05/2018
Fuente Revista: Energy Policy, Periodo: 1, Volumen: online, Número: , Página inicial: 112, Página final: 126
Estado info:eu-repo/semantics/publishedVersion

Resumen

Idioma es-ES
Idioma en-GB
Resumen

Increasing the share of renewable energy sources in the electricity sector (RES-E) contributes to achieving the European energy and climate targets including a 27% share of renewables in final energy consumption by 2030. We assess the future costs of the power sector for different RES-target levels and support schemes including generation costs, system operation costs and transmission grid development costs based on three power sector models. The results show similar power system costs for different target levels. RES-E shares below 70% involve limited infrastructure costs that are below 2.6% of the overall system costs. The impacts of the modelled RES-E policies, an EU quota and national feed-in premiums on transmission costs are ambiguous: Contrary to expectations, the costs of transmission network development under quota obligations are lower than under technology-specific feed-in premiums for RES-E penetration levels up to 50%. The drivers of transmission costs include not only a concentration of renewable capacity, but also the exact location of RES-E capacity with respect to existing power plants and the strength of the existing infrastructure. Quota obligations lead to higher grid costs than feed-in premiums if the RES-E share amounts to 70% due to the stronger regional concentration of RES power plants.

Grupos de investigación y líneas temáticas Instituto de Investigación Tecnológica (IIT)
Tipo de archivo application/pdf
Idioma en-GB
Tipo de acceso info:eu-repo/semantics/restrictedAccess
Fecha de modificacion 23/05/2022
Fecha de disponibilidad 11/06/2018
fecha de alta 11/06/2018

Kategoriak:

Honekin partekatua: