PublicadoEl 23/11/22 por Comillas
Artículo

Fuzzy maximum capacity and occupancy time rate measurements in urban railway lines

tipo de documento semantico ckh_publication

Ficheros

IIT-18-144A.pdf
Tamaño 2014195
Formato Adobe PDF
Fecha de publicación 22/12/2018
Fuente Revista: European Transport Research Review, Periodo: 1, Volumen: online, Número: 61, Página inicial: 1, Página final: 14
Estado info:eu-repo/semantics/publishedVersion

Resumen

Idioma es-ES
Idioma en-GB
Resumen

Nowadays, railway transport capacity is an important bottleneck for many railway operators that face its ever-increasing demand. This poses a challenge to existing lines as operation under conditions close to saturation tends be unstable. Capacity in urban railway systems depends largely on dwell times at platforms, but capacity measures proposed in literature rarely include the uncertainty associated to these times. In this paper this uncertainty is modeled as fuzzy numbers and two new capacity measures are proposed: the Fuzzy Maximum Capacity and the Fuzzy Occupancy Time Rate. The proposed model makes use of a railway simulator that enables route compression to obtain the conflict-free compressed time of the section under study.

Three practical capacity problems from the perspective of the railway traffic operator have been presented and solved. The new measures provide more information to the railway operator than the standard UIC method that does not include uncertainty regarding dwell times. Finally, the model has been applied to the section Gràcia-Sarrià, belonging to the Spanish railway operator FGC.

Grupos de investigación y líneas temáticas Instituto de Investigación Tecnológica (IIT)

Palabras clave

Tipo de archivo application/pdf
Idioma en-GB
Tipo de acceso info:eu-repo/semantics/openAccess
Fecha de modificacion 09/09/2022
Fecha de disponibilidad 10/01/2019
fecha de alta 10/01/2019

Kategoriak:

Honekin partekatua: