Facilitating the automatic mapping of IEC 61850 signals and CIM measurements

tipo de documento semantico ckh_publication

Ficheros

IIT-13-065A.pdf
Tamaño 1304975
Formato Adobe PDF
Fecha de publicación 01/11/2013
Fuente Revista: IEEE Transactions on Power Systems, Periodo: 1, Volumen: online, Número: 4, Página inicial: 4348, Página final: 4355
Estado info:eu-repo/semantics/publishedVersion

Resumen

Idioma es-ES
Idioma en-GB
Resumen

One of the main interoperability issues in electric power systems concerns the interactions between IEC 61850 and CIM standards. The state of the art includes solutions to facilitate the exchange of configuration files between the two standards. Nevertheless, there are no contributions in the literature aimed at facilitating the run-time interactions between IEC 61850-based
and CIM-based systems. Thus, at present, the signal mapping between these systems must be carried out manually. This paper presents a new methodology that helps to automate this process by utilizing ontology matching techniques. The proposed methodology was successfully evaluated with case studies based on four representative substation architectures.

Grupos de investigación y líneas temáticas Instituto de Investigación Tecnológica (IIT)

Palabras clave

Tipo de archivo application/pdf
Idioma en-GB
Tipo de acceso info:eu-repo/semantics/restrictedAccess
Fecha de modificacion 23/05/2022
Fecha de disponibilidad 15/01/2016
fecha de alta 15/01/2016

Kategoriak:

Honekin partekatua: