PublicadoEl 23/11/22 por Comillas
Artículo

Distribution network costs under different penetration levels of distributed generation

tipo de documento semantico ckh_publication

Ficheros

IIT-11-036A.pdf
Tamaño 1203337
Formato Adobe PDF
Fecha de publicación 01/09/2011
Fuente Revista: European Transactions on Electrical Power, Periodo: 1, Volumen: online, Número: 6, Página inicial: 1869, Página final: 1888
Estado info:eu-repo/semantics/publishedVersion

Resumen

Idioma es-ES
Idioma en-GB
Resumen

Nowadays, the amount of distributed generation (DG) connected to distribution networks is increasing significantly. In a European context, one of the main drivers for this growth is the support of electricity generation from renewable energy sources (RES) and combined heat and power (CHP) plants. Hence, these DG units mostly consist of non-controllable generation. Distribution is a regulated activity which is, at least, legally and functionally unbundled from the generation activity. These issues, together with the fact that distribution networks were not originally designed to accommodate generation, pose significant challenges on distribution network planning and operation. One of the major concerns of distribution system operators (DSOs) is the impact that large penetration levels of DG may have on distribution network costs. This paper presents a quantification of the impact of DG on distribution network costs in three real distribution areas. Different scenarios of demand and generation have been analysed for each region. Two possible situations are taken into account in each scenario: maximum net demand and maximum net generation. The computation of the distribution network costs was carried out by means of two large-scale distribution planning models called reference network models (RNMs).

Grupos de investigación y líneas temáticas Instituto de Investigación Tecnológica (IIT)
Tipo de archivo application/pdf
Idioma en-GB
Tipo de acceso info:eu-repo/semantics/restrictedAccess
Fecha de modificacion 23/05/2022
Fecha de disponibilidad 15/01/2016
fecha de alta 15/01/2016

Kategoriak:

Honekin partekatua: