PublicadoEl 23/11/22 por Comillas
Capítulo de libro

Solution of daily voltage constraints in the Spanish Electricity Market

tipo de documento semantico ckh_publication

Ficheros

IIT-02-030A.pdf
Tamaño 135871
Formato Adobe PDF
Fecha de publicación 24/06/2002
Fuente Libro: 14th Power systems computation conference -PSCC,Session 7, paper 2, page 1-7, Página inicial: , Página final:
Estado info:eu-repo/semantics/publishedVersion

Resumen

Idioma es-ES
Idioma en-GB
Resumen

Voltage constraints in the Spanish electricity market are solved connecting a set of off-line generators. The start up cost internalized in the fixed income term of the generator bid plays a key role in the solution of voltage constraints since the coupled solution of voltage constraints for the 24 hourly scenarios is different from the individual solution of each hourly scenario. This paper presents an optimization approach to obtain the coupled solution of the daily voltage constraints in the Spanish electricity market. The input data of the problem consists of the individual solutions for each hourly scenario and the bus voltage sensitivities with respect to active and reactive injection of non-connected units. The system cost reduction of the proposed approach is illustrated using an actual example of the Spanish electricity market.

Editorial Sin editorial (Sevilla, España)
Grupos de investigación y líneas temáticas Instituto de Investigación Tecnológica (IIT)

Palabras clave

Tipo de archivo application/pdf
Idioma en-GB
Tipo de acceso info:eu-repo/semantics/restrictedAccess
Fecha de modificacion 23/05/2022
Fecha de disponibilidad 15/01/2016
fecha de alta 15/01/2016

Categories:

Shared with: