PublicadoEl 23/11/22 por Comillas
Artículo

Production cost minimization versus consumer payment minimization in electricity pools

tipo de documento semantico ckh_publication

Ficheros

IIT-99-086A.pdf
Tamaño 138176
Formato Adobe PDF
Fecha de publicación 01/02/2002
Fuente Revista: IEEE Transactions on Power Systems, Periodo: 1, Volumen: online, Número: 1, Página inicial: 119, Página final: 127
Estado info:eu-repo/semantics/publishedVersion

Resumen

Idioma es-ES
Idioma en-GB
Resumen

Algorithms that involve some kind of optimisation have been adopted by several electricity pools as a tool to clear the market. Traditionally, this kind of models were used on a cost minimising basis, but recent papers have pointed out that alternative dispatches may be obtained that, even with higher production costs, provide cheaper electricity prices for consumers. This paper studies this new payment-minimisation approach, focusing on the long-term economic signals that it provides and analysing their impact on future investments. Our results show that minimising consumer payment results in discriminatory scheduling for certain generation resources and may cause, in the long-run, higher prices for consumers.

Grupos de investigación y líneas temáticas Instituto de Investigación Tecnológica (IIT)

Palabras clave

Tipo de archivo application/pdf
Idioma en-GB
Tipo de acceso info:eu-repo/semantics/restrictedAccess
Fecha de modificacion 23/05/2022
Fecha de disponibilidad 15/01/2016
fecha de alta 15/01/2016

Categories:

Shared with: