PublicadoEl 23/11/22 por Comillas
Artículo

Performance evaluation of start-up decisions of rapid-start units for AGC

tipo de documento semantico ckh_publication

Ficheros

IIT-15-049A.pdf
Tamaño 1213482
Formato Adobe PDF
Fecha de publicación 01/11/2015
Fuente Revista: IEEE Transactions on Power Systems, Periodo: 1, Volumen: online, Número: 6, Página inicial: 3130, Página final: 3138
Estado info:eu-repo/semantics/publishedVersion

Resumen

Idioma es-ES
Idioma en-GB
Resumen

Generating units, participating in the secondary frequency control of a control area, are usually spinning units already connected to the network and operating outside their range of optimal performance. This paper deals with an alternative method of providing secondary frequency control called Rapid-Start (RS). It consists in assigning a regulation band to several off-line units (RS units) which are capable of being started and connected rapidly, therefore allowing the online units to operate closer to their nominal power. As RS operation may have economic benefits, an appropriate algorithm to start up an RS unit needs to be developed. This paper proposes a methodology to evaluate, compare, and choose the most appropriate RS algorithm among the ones developed for a certain AGC control area. An optimization model provides a reference by determining the hypothetically ideal start-ups and shut-downs of RS units. In addition, the definition of performance indexes to evaluate, compare, and choose the different RS algorithms is proposed. The proposed methodology is illustrated for a secondary frequency control zone within the Spanish power system by using real data signals.

Grupos de investigación y líneas temáticas Instituto de Investigación Tecnológica (IIT)

Palabras clave

Tipo de archivo application/pdf
Idioma en-GB
Tipo de acceso info:eu-repo/semantics/restrictedAccess
Fecha de modificacion 23/05/2022
Fecha de disponibilidad 15/01/2016
fecha de alta 15/01/2016

Categories:

Shared with: