PublicadoEl 25/07/24 por Comillas
Working Paper

Optimal discretization of net head dependency in heterogeneous multi-reservoir hydroelectric systems

tipo de documento semantico ckh_publication

Ficheros

IIT-21-051A.pdf
Tamaño 319299
Formato Adobe PDF
Autor
Candela Ripoll, Ignacio
de Otaola Arca, Pedro
García González, Javier
Rivero Honegger, Carlos
Mariño Lizuain, Fernando Eduardo
Estado info:eu-repo/semantics/draft

Resumen

Idioma es-ES
Idioma en-GB
Resumen

Modeling the net head dependency of hydro power plants constitutes a serious challenge from the optimization point of view. One possible approach is to pre-establish a discrete set of representative net heads and to formulate the hydro scheduling problem assigning binary variables to activate the net head that better matches the reservoir level at each time interval. Given that increasing the number of binary variables can compromise the complexity of the resulting problem, the total number of discrete possible values must be bounded. In case of multi-reservoir systems with heterogeneous power plants, the common practice of assigning the same number for all the power plants could not be efficient as some binary variables might be providing too much accuracy in plants with a low impact on the global results, whereas plants with higher impact could be poorly represented.Given a maximum number of available binary variables, this paper presents a method to determine how many different net head values should be used for each individual power plant based on their technical characteristics. The proposed method is applied to a realistic system with satisfactory results.

Palabras clave

Tipo de archivo application/pdf
Idioma en-GB
Tipo de acceso info:eu-repo/semantics/restrictedAccess
Fecha de modificacion 04/03/2024
Fecha de disponibilidad 27/02/2024
fecha de alta 27/02/2024

Categories: