PublicadoEl 23/11/22 por Comillas
Artículo

Enhancing power supply adequacy in Spain: Migrating from capacity payments to reliability options

tipo de documento semantico ckh_publication

Ficheros

IIT-07-035A.pdf
Tamaño 161582
Formato Adobe PDF
Fecha de publicación 01/09/2007
Fuente Revista: Energy Policy, Periodo: 1, Volumen: online, Número: 9, Página inicial: 4545, Página final: 4554
Estado info:eu-repo/semantics/publishedVersion

Resumen

Idioma es-ES
Idioma en-GB
Resumen

There has been total unanimity about the vital importance of reliability of supply since the beginning of the electricity sector deregulation process. This paper describes the procedure proposed by Pérez-Arriaga et al. [2005. White paper for the reform of the regulatory scheme of the power generation in Spain. For the Ministry of Industry, Tourism and Trade of Spain (in Spanish)] to improve upon the current scheme to guarantee a reasonable reserve margin, the capacity payment mechanism. This alternative design introduces improvements aimed at guaranteeing at least a minimum capacity reserve margin, as well as at providing a strong incentive for generating units to be available when needed, namely, in situations when supply is likely to be insufficient to meet the total demand.

Grupos de investigación y líneas temáticas Instituto de Investigación Tecnológica (IIT)
Tipo de archivo application/pdf
Idioma en-GB
Tipo de acceso info:eu-repo/semantics/restrictedAccess
Fecha de modificacion 23/05/2022
Fecha de disponibilidad 15/01/2016
fecha de alta 15/01/2016

Categories:

Shared with: