PublicadoEl 23/11/22 por Comillas
Artículo

Economic effects of forecasting inaccuracies in the automatic frequency restoration service for the day-ahead energy and reserve scheduling of pumped storage plants

tipo de documento semantico ckh_publication

Ficheros

IIT-19-053A.pdf
Tamaño 1527371
Formato Adobe PDF
Fecha de publicación 01/09/2019
Fuente Revista: Electric Power Systems Research, Periodo: 1, Volumen: online, Número: , Página inicial: 105850-1, Página final: 105850-9
Estado info:eu-repo/semantics/publishedVersion

Resumen

Idioma es-ES
Idioma en-GB
Resumen

The economic effects of forecasting inaccuracies in the automatic frequency restoration service is analyzed in the context of the operation of a closed-loop and daily-cycle pumped-storage hydropower plant. The uncertainties when scheduling the automatic frequency restoration service are composed by the residual demand curves of the day-ahead reserve market, the upward and downward energy prices due to the activation of the reserves, and the percentages of the upward and downward real-time use of the committed reserves. The plant participates in the day-ahead energy market as a price-taker and in the reserve market as a price-maker, in the context of the Iberian electricity system. In addition, the energy due to the real-time use of the committed reserves is also considered. Results show that the profit is significantly more sensitive to forecast inaccuracies of the day-ahead energy market prices than of the prices and real-time use of reserves from the automatic frequency restoration service.

Grupos de investigación y líneas temáticas Instituto de Investigación Tecnológica (IIT)
Tipo de archivo application/pdf
Idioma en-GB
Tipo de acceso info:eu-repo/semantics/restrictedAccess
Fecha de modificacion 09/09/2022
Fecha de disponibilidad 27/11/2019
fecha de alta 27/11/2019

Categories:

Shared with: