PublicadoEl 24/11/22 por Comillas
Working Paper

Considering decentralized storage and renewable investments in transmission expansion planning: a bi-level approach

tipo de documento semantico ckh_publication

Ficheros

IIT-21-240C_abstract.pdf
Tamaño 182131
Formato Adobe PDF
Autor
González Romero, Isaac Camilo
Wogrin, Sonja
Gómez San Román, Tomás
Estado info:eu-repo/semantics/draft

Resumen

Idioma es-ES
Idioma en-GB
Resumen

In modern deregulated electricity markets, centralized TSOs decide network expansion, by aiming to maximize social welfare, while decentralized generation companies decide their generation investment by maximizing their own profit. This market structure creates contradictory incentives between market players and can lead to different outputs depending on who is the leader in the market, anticipating the decisions made by the others. Additionally, the increasing penetration of renewable energy, storage and distributed generation, might represent a rupture between short and long-term economic signals. Traditional cost minimization (social welfare maximization) models do not account for this type of interactions. As an alternative, we present a bi-level proactive transmission expansion framework in which a centralized TSO represents the upper level while the decentralized generation companies that trade in the market represent the lower level. We evaluate how planning the power system under a bi-level framework differs from a traditional cost minimization framework taking into account uncertainty in production of renewable resources.

Tipo de archivo application/pdf
Idioma en-GB
Tipo de acceso info:eu-repo/semantics/restrictedAccess
Fecha de modificacion 04/03/2024
Fecha de disponibilidad 05/05/2022
fecha de alta 05/05/2022

Categories:

Shared with: