Resumen

Idioma es-ES
Idioma en-GB
Resumen

This paper provides a tight description for the basic operating constraints of generating units for unit commitment (UC) problems: 1) generation limits, including 2) startup and shutdown capabilities, and 3) minimum up and down times. The Mixed-Integer Programming (MIP) formulation can be solved as a Linear Programming (LP) problem since its LP solution already provides integer solutions, hence obtaining dramatic improvements in computation time. We provide evidence of this by experimentally checking that all vertices of the feasible region
are integer, and by solving a self-UC for different case studies.

Palabras clave

Tipo de archivo application/pdf
Idioma en-GB
Tipo de acceso info:eu-repo/semantics/restrictedAccess
Fecha de modificacion 06/03/2024
Fecha de disponibilidad 18/10/2016
fecha de alta 18/10/2016

Shared with: