Long term issues to be addressed by regulators in liberalised electricity systems: generation adequacy and indicative planning. Justification, available mechanisms, and a simulation study on some concrete policies

tipo de documento semantico ckh_publication

Ficheros

IIT-09-028A.pdf
Tamaño 389616
Formato Adobe PDF
Autor
López-Peña Fernández, Álvaro
Centeno Hernáez, Efraim
Barquín Gil, Julián
Estado info:eu-repo/semantics/draft

Resumen

Idioma es-ES
Idioma en-GB
Resumen

For ensuring electricity security of supply in the long run, liberalised electric systems’ regulators have to worry, not only about the presence of enough installed capacity, but also about the generation mix. Hence, indicative planning must be taken into account as well, for limiting dependence upon non-indigenous fuels, for instance. This can, simultaneously, help in meeting growing environmental constraints: renewables promotion is a clear example. There exist several mechanisms for addressing the adequacy problem (having enough megawatts) and for promoting renewables (having the good megawatts).
In this study, a brief review of these mechanisms is done, and some are chosen for assessing their efficacy and efficiency over a system similar to the Spanish one, concretely capacity payments and capacity markets for the first problem and renewable energy premiums for the second. A simulation study is performed, which confirms the better characteristics of capacity markets in stabilising reserve margins, but whose effects may be damaged by an inadequate renewables promotion policy.

Tipo de archivo application/pdf
Idioma en-GB
Tipo de acceso info:eu-repo/semantics/openAccess
Fecha de modificacion 06/03/2024
Fecha de disponibilidad 18/10/2016
fecha de alta 18/10/2016

Shared with: