Operation of rapid start units in an AGC area

tipo de documento semantico ckh_publication

Ficheros

IIT-12-002A.pdf
Tamaño 385981
Formato Adobe PDF
Fecha de publicación 01/01/2012
Autor
Egido Cortés, Ignacio
Fernández Bernal, Fidel
Rouco Rodríguez, Luis
Saboya Bautista, Inmaculada
Fuente Revista: Przeglad Elektrotechniczny, Periodo: 1, Volumen: online, Número: 01a, Página inicial: 141, Página final: 145
Estado info:eu-repo/semantics/publishedVersion

Resumen

Idioma es-ES
Idioma en-GB
Resumen

Rapid Start units can be used in an AGC area as units that can participate in AGC regulation but that remain offline until they are needed. The generation cost of these units is high so usually it is preferred to keep them offline. However, they usually show good dynamic characteristics that make them very suitable for AGC operation. The startup process of these units is very fast so they can be online and providing regulation within just a few minutes. In this paper a simple algorithm is presented to determine when it is needed to start up an offline rapid start unit to provide AGC service. The algorithm proposed is tested using real operation data. The results obtained show that the algorithm proposed successfully starts up a rapid start unit so that it is online when needed to provide AGC regulation. How to select the most appropriate values for the algorithm parameters is also analyzed.

Grupos de investigación y líneas temáticas Instituto de Investigación Tecnológica (IIT)

Palabras clave

Tipo de archivo application/pdf
Idioma en-GB
Tipo de acceso info:eu-repo/semantics/openAccess
Fecha de modificacion 06/03/2024
Fecha de disponibilidad 15/01/2016
fecha de alta 15/01/2016

Categorías:

Compartida con: