PublicadoEl 23/11/22 por Comillas
Capítulo de libro

Impact of intermittent generation on the expansion of the spanish power system interconnection capacity

tipo de documento semantico ckh_publication

Ficheros

IIT-11-064A.pdf
Tamaño 473602
Formato Adobe PDF
Fecha de publicación 19/06/2011
Fuente Libro: IEEE PES Trondheim PowerTech 2011, Página inicial: , Página final:
Estado info:eu-repo/semantics/publishedVersion

Resumen

Idioma es-ES
Idioma en-GB
Resumen

The expected massive penetration of renewable energy sources (RES) in Spain, added to its limited electricity interconnection capacity, will demand not only the introduction of flexible resources in the Spanish power system but also a stronger transmission capacity between this country and Europe. In this context, this paper computes the economic additional
interconnection capacity between Spain and Central Europe based on the trade-off between transmission capacity cost and RES spillage cost. For this purpose, a model that simulates the
hourly operation of the Spanish power system for a period of one year is used to compute hourly spillage. This analysis covers the period of 2020-2050 and includes four scenarios of RES
penetration. In addition, a sensitivity analysis in relation to the cost parameters is presented.

Editorial Norwegian University of Science Technology (NTNU), IEEE PE Norway Chapter (Trondheim, Noruega)
Grupos de investigación y líneas temáticas Instituto de Investigación Tecnológica (IIT)

Palabras clave

Tipo de archivo application/pdf
Idioma en-GB
Tipo de acceso info:eu-repo/semantics/restrictedAccess
Fecha de modificacion 23/05/2022
Fecha de disponibilidad 15/01/2016
fecha de alta 15/01/2016

Categorías:

Compartida con: