A goal programming model for rescheduling of generation power in deregulated markets

tipo de documento semantico ckh_publication

Ficheros

IIT-03-041A.pdf
Tamaño 117878
Formato Adobe PDF
Fecha de publicación 01/04/2003
Fuente Revista: Annals of Operations Research, Periodo: 1, Volumen: online, Número: 1-4, Página inicial: 45, Página final: 57
Estado info:eu-repo/semantics/publishedVersion

Resumen

Idioma es-ES
Idioma en-GB
Resumen

In deregulated electrical systems, production schedule for power plants is the result of an auction process. In the Spanish case, this schedule includes two main concepts: energy production (to be actually produced) and secondary reserve (to maintain available). The generation company faces the problem of converting energy schedule into a power schedule, respecting the reserve schedule as well as technical constraints, and trying to accomplish different goals: to minimise the production costs, to obtain smooth shapes for the power schedules and to optimise eventual compensation in schedules. A weighted goal mixed integer programming model with a real-size application to deal with this problem is presented.

Grupos de investigación y líneas temáticas Instituto de Investigación Tecnológica (IIT)

Palabras clave

Tipo de archivo application/pdf
Idioma en-GB
Tipo de acceso info:eu-repo/semantics/restrictedAccess
Fecha de modificacion 23/05/2022
Fecha de disponibilidad 15/01/2016
fecha de alta 15/01/2016

Categorías:

Compartida con: