Ramp-based scheduling vs. energy-block scheduling in day-ahead market

tipo de documento semantico ckh_publication

Ficheros

IIT-16-030A.pdf
Tamaño 464587
Formato Adobe PDF
Autor
Zhao, Quanyu
Morales España, German Andres
Baldick, Ross
García González, Javier
Ramos Galán, Andrés
Estado info:eu-repo/semantics/draft

Resumen

Idioma es-ES
Idioma en-GB
Resumen

Although unit commitment (UC) based on energy blocks is the most common way to schedule the generators in current power systems, it has been reported that it may not be capable of guaranteeing feasible schedules. In particular, when the instantaneous power trajectories are not modeled explicitly, the solution of the energy-block based UC may include violations
of ramp constraints of thermal units, which will typically be managed by an inefficient use of the operating reserves procured. In order to cope with these drawbacks, a new ramp-based UC
formulation has been proposed recently in the literature, where it simultaneously schedules ramp and energy. However, this approach has only been tested with academic study cases. In
order to assess the applicability of such ramp-based UC, this paper presents a comprehensive comparison between the two scheduling approaches applied to a realistic system. The ERCOT system has been selected as a good representative of a large system, where the generation mix is mainly thermal with a remarkable presence of renewable generation. The numerical results obtained provide strong evidence about the benefits of the ramp-based UC with respect to the energy-block approach.

Palabras clave

Tipo de archivo application/pdf
Idioma en-GB
Tipo de acceso info:eu-repo/semantics/restrictedAccess
Fecha de modificacion 06/03/2024
Fecha de disponibilidad 18/10/2016
fecha de alta 18/10/2016

Compartida con: