Minimum-cost-based electricity generation capacity planning: does annualized investment cost always yield full cost recovery with marginal pricing?
tipo de documento semantico ckh_publication
Ficheros
IIT-21-213WP.pdf
Tamaño
726693
Formato
Adobe PDF
Url del contenido
https://repositorio.comillas.edu/rest/bitstreams/484072/retrieve
Centeno Hernáez, Efraim
Campos Fernández, Francisco Alberto
Maguregui, Javier
Wogrin, Sonja
Estado
info:eu-repo/semantics/draft
Resumen
Idioma
es-ES
Idioma
en-GB
Resumen
This papers presents some advances in answering the question of cost recovery of investments for the optimal technological mix in electricity systems.